計畫緣起(Project background):

高雄機場現有09-27跑道乙條,長3150公尺寬60公尺,為混凝土之剛性道面,自民國76年7月啟用至今使用屆30年,已屆混凝土結構物使用年限,故本站擬辦理「高雄機場跑道整建工程」案,辦理既有跑道整建(含道面銜接處理)、跑道及滑行道地帶整修與植草、跑道燈光設施與管線配合抬升及更換工程、增設27跑道進場燈、改善場內排水設施(積水潛勢處)及既有空側設施配合ICAO規範改善等作業。

Kaohsiung Airport currently has a rigid pavement of concrete runway 09-27, 3150 meters long and 60 meters wide. It had been operating for over 30 years since its inauguration in July 1987 and had reached the end of service duration for concrete structures. In consideration of the operation, airport authority started the “Kaohsiung Airport Runway Reconstruction Project" to handle the existing runway reconstruction (including pavement connection processing), runway and taxiway strip renovation and grass planting, lift and replacement of runway lighting facilities and pipelines, additional runway 27 approach lights, improvement of drainage facilities in the field (potential standing water area) and existing airside facilities improvement meeting ICAO regulations.

選單